F2A Construction portfolio

Spaces built for the work ahead.

Every project starts with a clear plan and ends with a finished space ready to perform. Explore the kinds of commercial improvements F2A Construction is equipped to deliver.

Construction professionals meeting at a project site
Prepared for the next project, from scope through handoff.

Commercial projects, finished with purpose.

From refreshed interiors to detailed renovation scopes, we bring dependable coordination and hands-on workmanship to commercial environments throughout the Houston area.

01

Interior renovations

Practical commercial updates that transform existing spaces while keeping the details, schedule, and next steps in focus.

02

Flooring and finishes

Durable flooring, paint, drywall, and finish work selected and installed to support daily use.

03

Buildout support

Framing, acoustical ceilings, and targeted demolition work that helps bring a new layout or next phase to life.

Past projects at a glance

A compact record of completed commercial work for Houston-area schools, public facilities, higher education, and municipal partners. Open a client group to view each project scope.

01

Houston ISD

View projects

Lamar High School

Installed 38,000 sq ft of ceiling tile and grid, 4,000 linear ft of stained crown molding, approximately 22,000 sq ft of drywall, and painted approximately 260,000 sq ft.

Johnston Middle School

Painted 200,000 sq ft of wall space and installed 63,000 sq ft of ceiling tile grid.

Long Middle School

Installed 69,000 sq ft of VCT, 11,000 sq ft of ceramic tile, and 7,500 sq ft of carpet.

Westbury High School

Painted the boys’ gym and 26,000 sq ft of wall space.

McNamara Elementary School

Installed 19,000 sq ft of VCT.

Kashmere High School

Removed and repainted all lockers in corridor areas.

Browning Elementary

Installed approximately 28,000 sq ft of VCT and approximately 28,000 sq ft of ceiling grid and tile; painted the entire school interior and exterior.

Whittier Elementary

Installed more than 26,000 sq ft of resilient tile and 26,000 sq ft of acoustical ceilings.

02

City of Houston

View projects

City Hall

Prepped, primed, and painted City of Houston offices, conference rooms, and hallways on the 1st, 2nd, and 4th floors.

611 Walker

Prepped, primed, and painted several floors of City of Houston offices, hallways, bathrooms, conference rooms, and HVAC.

Cloverland Park

Installed 3,100 sq ft of resilient tile, including prep, cove base, and trim.

Houston Police Department at 1217 Milam

Converted open space into five offices, a reception area, kitchen, and storage area; provided and installed drywall, framing, doors and hardware, storefront glass, paint, millwork, carpet tile, VCT, and kiosks.

Houston Police Department at West Montgomery

Converted open space into two offices and an interrogation room; provided and installed drywall, paint, ceiling tile, carpet tile, doors, hardware, and privacy glass.

Public Works Buildings, Health & Human Services and Permit Office

Prepped, primed, and painted several offices, hallways, and doors and frames.

BARC

Converted open space into separate dog and cat areas; provided and installed painting, millwork, CMU, doors, and frames.

Neches Public Works Building

Painted approximately 42,000 ft of interior and exterior surfaces, installed 5,000 ft of VCT and 4,600 sq ft of ceiling tile, and painted 8,500 ft of epoxy resin.

Collier Public Library

Renovated the entire library with new millwork, flooring, painting, drywall, and storefront glass.

Carnegie, Central, Julia Ideson, McGovern-Stella Link, Frank and Vinson Public Libraries

Prepped, primed, and painted several areas, from corridors to offices.

03

Texas Southern University

View projects

Rob Paige Education Building

Installed 8,500 sq ft of resilient tile with prep, cove base, and trim, plus 3,000 sq ft of carpet tile.

E.O. Bell Building

Installed 9,300 sq ft of resilient tile with prep, cove base, and trim.

Terry Library

Installed 2,200 sq ft of resilient tile with prep, cove base, and trim, plus 11,300 sq ft of carpet tile.

Lanier West Dormitory

Painted the entire 1st and 3rd floors; replaced ceiling tile in many areas, some doors and frames, repaired flooring throughout, and replaced windows throughout.

Terry Library Basement Build-out

Converted open space into eight offices, a conference room, five classrooms, a computer lab, and storage area; installed drywall, framing, ceiling tile, VCT, doors, frames, hardware, and painting.

Hannah Hall COO Build-out

Converted open space into six offices, a conference room, and a bathroom; installed drywall, framing, ceiling tile, vinyl plank, carpet tile, ceramic tile, doors, frames, hardware, and painting.

Airway Science Building

Painted the entire interior and exterior; installed carpet tile and VCT, and replaced some ceiling tile.

04

Aldine Independent School District

View projects

Awarded painting and maintenance contractor

Floors 2 Adore / F2A Construction is the awarded painting and maintenance contractor for Aldine ISD.

Thorne Stadium

Prepped, primed, and painted signs, concrete walls, press box interior and exterior, stadium speakers, concrete landings on the field, and doors.

Smith Academy

Painted 63 classrooms; installed 68 toilet partitions, mirrors, and hardware; installed 31,000 sq ft of acoustical ceilings; and provided and installed 87 doors and related hardware.

Bethune Academy

Prepped, primed, and painted 53 classrooms and the library.

Orange Grove, Jones, Keeble, Dunn and Hoffman Elementary Schools

Prepped, primed, and painted 23 temporary buildings, interior and exterior, across campuses.

Raymond Academy, Drew Academy, Eisenhower HS, Sammons Elementary, Human Resources, Aldine 9th, Nimitz 9th, Tax Office, Carver HS, Bussey Elementary, Kujawa Elementary, Oleson Elementary, Grantham MS, Davis HS and Lewis MS

Painted acoustical ceilings, doors, electrical and bathroom plumbing across projects ranging from several classrooms to dozens, as well as corridors, gyms, and offices.

Francis Elementary

Prepped, primed, and painted exterior gutters and downspouts, windows, soffits, doors, and the gym.

Hambrick MS, Nimitz HS and Plummer MS

Prepped, primed, and painted all boys’ and girls’ locker-room ceilings and walls, plus epoxy floors.

05

Houston Community College and Fort Bend ISD

View projects

Scarcella Campus

Installed 11,000 sq ft of resilient tile with prep, cove base, and trim, plus 5,500 sq ft of carpet tile.

Codwell Campus

Installed 12,800 sq ft of carpet tile.

3601 Fannin

Converted the former Planned Parenthood building into HCC Fashion Design; installed millwork, paint, and interior build-outs.

Westgate Campus

Installed 5,700 sq ft of resilient tile with prep, cove base, and trim, plus 1,800 sq ft of carpet.

3100 Main Campus

Painted 16,000 sq ft of walls and 48 doors and frames; installed 8,400 sq ft of carpet tile.

San Jacinto Campus

Installed 10,200 sq ft of resilient tile with prep, cove base, and trim, plus 12,300 sq ft of carpet.

SIS Building

Installed 4,400 sq ft of resilient tile with prep, cove base, and trim.

Coleman Science Building

Installed 950 sq ft of resilient tile with prep, cove base, and trim; installed porcelain tile on the walls, floor, and shower area of the president’s private bath; and installed 1,945 sq ft of carpet tile in classrooms and the President’s Suite.

Roland W. Smith Building

Painted the entire building interior.

Clements High School, Fort Bend ISD

Renovated and remodeled all bathrooms.

The work behind every finished space

Plan before the work begins

We review the scope and sequence so the project has a clear path forward.

Coordinate the details

We stay focused on the trades, materials, and milestones that keep work moving.

Deliver with accountability

We approach every handoff with the care and quality your space deserves.